Showing posts with label Permit Receiver. Show all posts
Showing posts with label Permit Receiver. Show all posts

Wednesday, March 30, 2016

HSE Offcier/Supervisor



Dear Candidate,
Looking for HSE Offcier/Supervisor
Experience in Oil& Gas Industry
Experience working on Saudi Aramco Projects /Saudi Aramco Approved
Looking for someone who can join in 10 -15 days or immediate joining

Shraddha Sawant
HR- Business Consultant
Universal Hunt Private Limited
22| Techniplex I | SV Road | Goregaon West | Mumbai - 400 064
Tel: +91 22 42986539
shraddha.s@universalhunt.com
www.universalhunt.com

Wednesday, March 16, 2016

Saudi Aramco Work Permits Types


Saudi Aramco Work Permits Types


There are 4 types of work permit used in saudi Aramco


  1. Cold work permits
  2. Confined Space Entry Permit
  3. Release Permit
  4.  Hot Work Permit


Cold work permits

Confined Space Entry Permit

 Release Permit

 Hot Work Permit

SAFETY JOBS

Dear Candidate,

Penta Associates is a reputed consulting and recruitment service firm based at Kochi, Kerala, India. Founded in 2009, Penta Associates offers end-to-end manpower outsourcing services and international manpower placement services. The Company is driven by Idea and Zeal, and prides itself by providing its clients with the most outstanding personnel.

Currently we are having an opening for A "Safety Officer " for one of our reputed clients in Qatar.

They prefer a candidate with GCC experience in electrical projects and who have passed Kahramaa.

If you are interested kindly forward your resume attached with your photo.

Best Regards,
Chippy
Executive- Talent Acquisition,
Penta Associates
Kakkanad, Cochin - 682021
Kerala, India

Email: chippy@pentaassociates.com
Web : www.pentaassociates.com
Ph No:8606393600

Tuesday, March 15, 2016

SAFETY JOBS

Dear Candidate,

Hope you are doing good. please read this email completely before responding.


Open Position:-


S.No. Poition Salary
1 HSE Officer Basic Salary SAR 2500 to 4500 + OT
2 HSE Supervisor Total Salary 7000-8500 (Including OT)
3 HSE Admin/ Document Controller Basic Salary SAR 2500 to 4500 + OT
4 Environmental coordinator Total Salary 7000-9000 (Including OT)



We need SAUDI ARAMCO approved or Saudi Aramco Project Experience candidates only who are having current or previous SAUDI ARAMCO project experience related to PIPELINE, we have huge number of requirement against below mentioned categories. We are looking for TRANSFERABLE IQAMA from any nationality or ready to join candidates from any eastern countries.

This is with reference to free recruitment for Engineering professionals (10+ yrs) from Petroleum Pipeline Constructions Projects with Saudi Aramco experience for leading contracting company from Saudi Arabia for Skype Interview. We are looking for transferable IQAMA or someone who can join within 10-20 days from date of offer.

For the position of 1. HSE Officer, 2. HSE Supervisor, 3. HSE Admin/ Document Controller, 4. Environmental coordinator, 5. HSE Officer, 6. HSE Trainer

.
Note:- Please find the below mention details, If you are interested please share your updated CV (Word Format) along with Salary slip, current or last company contract, experience certificates, passport copy along with below mention details and also share this email in your network for references.


Note:- For all openings we need Saudi Aramco approved engineering professionals with 8 or 10+ yrs of relevant experience.

1) Contracting Company:- Leading Saudi Contracting Company

Interview Mode:- Skype

Age Limit:- Up to 48 Years

Experience:- 10+ Years

Job location- Anywhere in Saudi Arabia

Following benefits would also be provided apart from monthly cash salary:
* 30 days paid leave per year with air tickets per year.
* Company provided Health Insurance
* Employment visa and all related cost
* One year renewable contract with annual increments
Free Food
Free Accommodation
Free Transportation
Visa Type - Single

Please give below mentioned details with your updated CV(Must), Aramco Approved certificate, experience certificate etc

1. Position Applied for-
2. Total Year of experience:-
3. Relevant Experience:-
4. Academic Qualification:-
5. Passport No. & Validity date:-
6. Current Salary:-
7. Expected Salary
8. Notice Period:-
9. Emergency/Alternate contact number:-
10. Skype ID:-
11. Present Location-
12. Alternate Contact number:-
13. Degree:-
14. DOB:-
15. Emergency Contact Number:-
16. Transferable IQAMA (Yes or No):-
17. Can join in 10-15 days or immediately from offer (Yes or No):-

.
You can connect with me on WhatsApp and Skype for further detail discussion. you can connect with my Skype id ROSHAD786 & on WhatsApp, IMO & Line with my India number 00-91-9899069149

You can also connect with me on Facebook for future references:- My Facebook URL is:-https://www.facebook.com/profile.php

You can join Aastha Consulting for latest job updates on our Facebook page:- https://www.facebook.com/groups/238907179525290

Please feel free to get back to me for any further details on the same.

About Aastha Consulting:-

For your information's we are hiring for companies from industries like Oil & Gas, Petrochemical, EPC, Engineering Constructions, Cement, Steel, Plastic, IT Software, mobile devices, retail, E- Commerce etc. for countries like Saudi Arabia, UAE, INDIA, USA, UK, South Africa, Philippines etc.

We have a strong team of head hunters who make use of modern tools of communication to establish a network of professionals from across the industries. We specialize in hiring niche industries such as, Oil & Gas, EPC, Engineering Constructions, IT Software, mobile devices, retail, E- Commerce etc.

for IT we are hiring across the level for research labs, Broadcasting domain, Consumer electronics, Mobile R&D, 2G, 3G, Cloud computing, Embedded, Networking & PHD hiring from premier institute for R&D centres in India.


Kindly call me on below mentioned number for any further details.


Regards,
Roshad Ul Haque
Managing Partner

Aastha Consulting
C: +91-9899069149
P: 011 656363642
E: roshad@aasthaconsulting.com
W: http://www.aasthaconsulting.com
LinkedIn URL:- https://in.linkedin.com/in/roshad
Skype: ROSHAD786
WhatsApp: 00-91-9899069149

Saudi Aramco Work Permit Receiver Q&A

Dear all,
            Good day, Saudi aramco is the world 4th biggest petrochemical company in the world  Yesterday lot of safety friend they comment their email address for saudi Aramco work permit receiver answer so i cant send everyone here i publish the answer of those questions its useful to everyone


Saudi Aramco Work Permit Receiver Q&A
1) The issuer must stop work if ……….
            a. The issuer leaves the job site.
            b. More men are working than stated on the permit.
            c. The site was found to be unsafe.*
            d. The issuer looses his copy of the permit.

2) A pipe fitter cannot work on the same pieces of equipment using welder’s permit because.
            a. Welder’s are usually contractors.
            b. Gas tests are not needed for pipefitters.
            c. Each type of work involves different hazards.*
            d. Joint site inspections are not needed for pipefitters.

3) If a work permit is not issued during an emergency, what must be done to do the work?
            a. Superintendent must approve.
            b. All safety precautions must be taken.*
            c. Wear Scott air Pak.
            d. Joint site inspection.

4) The Receiver must be stop work if ………………. .
            a. He cannot find the issuer.
            b. The work site becomes unsafe.*
            c. The issuer leaves the site.
            d. The designated representative must leave.

5) Which of the following is not a restricted area?
            a. Tank farm
            b. Loading pier.
            c. Dump site. *
            d. Gasoline station.

6) What is the purpose of the work permit system?
            a. To insure that hot work is not done in restricted area.
            b. To authorize specific construction or maintenance work. *
            c. To document where receiver start work for time keeping.

7) What do you call an area where work permits are required?
            a. Restricted area. *
            b. Sensitive area.
            c. Controlled area.
            d. Dangerous area.

8) Who must sign a permit issued for to 30 days?
            a. Receiver and designated representative.
            b. Operation and maintenance division heads. *
            c. Designated representative 
            d. Operations foreman, issuer and receiver. 

9) Who is the check list section important to issuer and receiver.
            a. It tells them all the precautions to take.
            b. It make sure important steps have been taken.*
            c. It defines the duration and scope of work.
            d. It controls the receiver’s break time.

10) Which work permit requires sewer to be covered within 75 feet?
            a. Entry
            b. Cold
            c. Hot*
            d. Release

11) Who is responsible for safety at the work site after a permit has been extended?
            a. The original issuer and receiver.
            b. The person who countersigned the permit.
            c. The one who originally did the joint site inspection
            d. The issuer and receiver who signed the extension.*

12) What happens if work must continue past the time the original permit was to expire?
            a. Extend the permit or issue a new one.*
            b. Work can continue until the job is completed.
            c. Stop work and came back next day.
            d. Keep working but tell the issuer.

13) What are the basic precautions for confined space entry, select all items that apply.
            a. A sign a standby man, install lighting, install air mover.*
            b. Take gas test.*
            c. Isolate, clean and purge equipment.*
            d. Use PPE.*

14) A release of hazardous liquids or gases permit is required when?
            a. Operators release hydrocarbons to the flare.
            b. Crafts man builds a scaffold.
            c. Pipefitters open a line or install blinds.*
            d. Operation drain equipment.

15) What hazard would you find when doing hot work?
            a. Auto ignition temperature.
            b. Ignition source.*
            c. Ignition switch.
            d. Ignition point.

16) We use work permit in hazardous areas to identify …………
            a. Expired permit.
            b. Alternated representative.
            c. The designated representative.
            d. Hazards and precautions.*

17) The use of a vehicle in an operating area requires, which work permit?
            a. Entry
            b. Hot *
            c. Cold
            d. Release

18) What are the basic precautions for cold work? Select all items that apply?
            a. Gas test.
            b. PPE, barricade and warning signs.*
            c. Special work precautions.
            d. Standby man.
            e. Fire watch.

19) What is oxygen deficiency?
            a. A lower than normal amount of oxygen. *
            b. Higher than normal amount of oxygen.
            c. Less 23.5% oxygen.
            d. Oxygen that above it’s flash point.

20) What are the basic precautions for hot work permit? Select all items that apply?
            a. Blind, isolate, clean and purge equipment.*
            b. Fire watch.*
            c. Fire protection equipment*
            d. Cover sewer drains.*
            e. Gas test.*

21) What is the acceptable level of LEL to allow hot work?
            a. 10 to 100 PPM.
            b. 0.0 PPM. *
            c. 5% to 50%
            d. 21% to 23.5%

22) Select the statement where all THREE items are needed before allowing entry into a confine space?
            a. Air mover, respirators and countersignatures.
            b. Fire watch, air mover, gas test.
            c. Gas test. Fire extinguisher, barricades.
            d. Lighting, standby man, air mover. *

23) The receiver can leave the job site any time as long as he gets the permeation from his supervisor. 
            a. True
            b. False *

24) Who should keep the work permit?
            a. The standby man.
            b. The receiver and issuer.*
            c. Fire watch.
            d. Craft man.

25) What should be a assigned when working near combustible materials? 
            a. Standby man
            b. Fire watch *
            c. Fire man
            d. Flag man

26) What training should a fire watch have?
            a. Operate heavy equipment. 
            b. Operate control room.
            c. Operate fire equipment.* 
            d. Operate radio equipment.

27) Who should ask for work permit before they start working?
            a. The standby man.
            b. The receiver.*
            c. The fire watch.
            d. The issuer.

28) Who should point out all hazards and write on the work permit? 
            a. The issuer.*
            b. The standby man.
            c. The fire watch
            d. The receiver.

29) Who is responsible for the safety on the work site?
            a. The receiver.
            b. The issuer.
            c. Both issuer and receiver.*
            d. Both fire watch and the standby man.

30) What is the purpose of the joint site inspection?
            a. To check the availability of equipment and man power.
            b. To see the work plan and it is implementation.
            c. To discuss the work and identify any hazards and risk.*
            d. To meet the works and observe their activities.

31) What must be checked during the joint site inspection? Select all items that apply.
            a. Safety devices.*
            b. Equipment condition.*
            c. Gas test.
            d. Attendance report.

32) Who decides whether an area should be restricted or not?
            a. The department manager. *
            b. The superintendent.
            c. The issuer.
            d. The receiver.

33) What type of work does the work permit system authorize?
            a. Specific construction, maintenance or repair work.*
            b. All work constructed for Saudi Aramco.
            c. All work done by maintenance or contractors.
            d. Non-hazardous work where safety is important.

34) Who is a work permit receiver?
            a. A qualified Saudi Aramco employee.
            b. A person certified to receive permit.*
            c. A person nominated by his supervisor.
            d. A maintenance or contract worker.

35) The safety of work site is a sole responsibility of an issuer?
            a. True.
            b. False.*

36) What responsibility do issuers and receivers share when signing a work permit?
            a. Responding to emergency events.
            b. Monitoring the operation of process.
            c. Maintaining safety conditions at the site.*
            d. Getting countersignatures form superintendent.

37) Restricted areas include which locations?
           
a. Gas plant, tank farms, and assembly areas.
            b. Pump station, tank farms, and gas well. *
            c. Dining halls housing unites, and operating area.
            d. Welding shops pump station, and assembly area.

38) Who can decided that work is a low risk and that a work permit is not needed?
            a. The superintendent. *
            b. The receiver.
            c. The department manager.
            d. The issuer.*

39) Who must sign the work permit to close it?
            a. Competent person.
            b. Issuer and receiver. *
            c. Gas tester, issuer and receiver.
            d. Designated representative.

40) What must the receiver do if he stops work?
           
a. Tell the senior crafts man.
            b. Tell the designated representative.
            c. Tell the issuer. *
            d. Tell his immediate supervisor.

41) Work permit can be issued for up to 30 days if ……….
            a. The work site is far away.
            b. Only cold work will be done.
            c. It is highly unlikely that conditions will change. *
            d. The receiver cannot close the permit.

42) Who must sign a work permit to extend it?
            a. Superintendent’s countersignature is required.
            b. The new issuer, receiver and gas tester.
            c. The new issuer and receiver. *
            d. The new area foreman and the new issuer.

43) “use a fire blanket” or “hand dig only” are example of what?
            a. Hazards.
            b. Precautionary hazards.
            c. Regular precaution.
            d. Additional precautions. *

44) Work permit authorize …………
            a. Specific work at specific location. *
            b. Specific tools at general location.
            c. General work at specific plant.
            d. General equipment at all work site.

45) Where could an issuer find out which permit to issue for a special job?
            a. Facility operating instruments.
            b. On the front of any work permit.
            c. On the back of any work permit. *
            d. Corporate loss prevention manual.

46) The information’s entered in the “extra work location” box is important because it controls?
            a. What equipment the receiver can use.
            b. Where the receiver can work. *
            c. How long the receiver can work.
            d. How many worker can be at the job site?

47) What considered cold work?
            a. Sand removal and scaffold building. *
            b. Brush painting and abrasive blasting.
            c. Scaffold building and grinding.
            d. Abrasive blasting and painting.

48) What must the issuer do if a join site inspection is not done?
            a. Required barricades and warning sign.
            b. A sign a designated representative.
            c. Tell his foreman.
            d. Write why not on the permit. *

49) What must the issuer write in the work permit?
           
a. Name, badge number and certificate expiry date.
            b. Gas test results, name and badge number.
            c. Name, organization code and badge number. *
            d. Badge number and certificate number.

50) What information must the gas tester enter on the work permit?
            a. LTX-310 expiry date, name and badge number.
            b. Badge and certification number.
            c. Gas test results and normal level.
            d. Gas test results, name and badge number. *

51) Any worker can be a sign as standby man?
            a. True 
            b. False. *

52) Why must equipment be de-energized and depressurized before work is started?
            a. Accidental start-up could happen. *
            b. Purge gas can be lost.
            c. Locks and tags will deteriorate.

53) Who install locks and tags first?
            a. contractor.
            b. Power distribution.
            c. Electrical engineer.
            d. Operation. *

54) Installing lock and tags on electrical breakers prevents accidental.
            a. Blind installation.
            b. Start-up of equipment *
            c. Nitrogen release.
            d. Purging of equipment.

55) The issuer must try to start-up equipment at the field switch after it has been isolated and before work start to make sure.
            a. Locks and tags are installed.
            b. The receiver’s tag is installed.
            c. There is no tag in the area.
            d. It cannot accidently start. *

56) How can process equipment be cleaned?
            a. Treating and hydro cracking.
            b. Closing valves and adding locks
            c. Gas testing and steaming
            d. Steaming and or water- washing. *

57) Who installs receiver’s locks?
            a. One member from each work crew. *
            b. The engineer and receiver.
            c. The issuer and receiver.
            d. Every member of the work crew.

58) When operators change shifts.
            a. Their keys are usually transferred to the next shift. *
            b. Their tags must be erased.
            c. Their locks and tags must be removed.
            d. Their locks must be replaced.

59) We isolate equipment to make sure it cannot be.
            a. Shut-down on purpose.
            b. Shut-down by accident.
            c. Taken to a shop for repair.
            d. Started-up, leak or cause electrical shock. *

60) Why are hold tag installed?
            a. To record gas tests.
            b. To record accidents.
            c. Explain why the lock is installed? *
            d. To identify the issuer and receiver.


61) Removing fuses form an electrical circuit or disconnecting electric wiring is an example of what?
            a. Locking
            b. Cleaning.
            c. Purging.
            d. Isolating. *

Saudi Aramco Work Permit Receiver Questions

Saudi Aramco Work Permit Receiver Questions


Dear all,
           Here we share saudi Aramco work permit receiver questions.its useful to you for understanding saudi Aramco safety regulation. if you want correct answer  comment your email id below. you will receive the answer to your inbox 




1) The issuer must stop work if ……….
            a. The issuer leaves the job site.
            b. More men are working than stated on the permit.
            c. The site was found to be unsafe.
            d. The issuer looses his copy of the permit.

2) A pipe fitter cannot work on the same pieces of equipment using welder’s permit because.
            a. Welder’s are usually contractors.
            b. Gas tests are not needed for pipefitters.
            c. Each type of work involves different hazards.
            d. Joint site inspections are not needed for pipefitters.

3) If a work permit is not issued during an emergency, what must be done to do the work?
            a. Superintendent must approve.
            b. All safety precautions must be taken.
            c. Wear Scott air Pak.
            d. Joint site inspection.

4) The Receiver must be stop work if ………………. .
            a. He cannot find the issuer.
            b. The work site becomes unsafe.
            c. The issuer leaves the site.
            d. The designated representative must leave.

5) Which of the following is not a restricted area?
            a. Tank farm
            b. Loading pier.
            c. Dump site.  
            d. Gasoline station.

6) What is the purpose of the work permit system?
            a. To insure that hot work is not done in restricted area.
            b. To authorize specific construction or maintenance work.  
            c. To document where receiver start work for time keeping.

7) What do you call an area where work permits are required?
            a. Restricted area.  
            b. Sensitive area.
            c. Controlled area.
            d. Dangerous area.

8) Who must sign a permit issued for to 30 days?
            a. Receiver and designated representative.
            b. Operation and maintenance division heads.  
            c. Designated representative 
            d. Operations foreman, issuer and receiver. 

9) Who is the check list section important to issuer and receiver.
            a. It tells them all the precautions to take.
            b. It make sure important steps have been taken.
            c. It defines the duration and scope of work.
            d. It controls the receiver’s break time.

10) Which work permit requires sewer to be covered within 75 feet?
            a. Entry
            b. Cold
            c. Hot
            d. Release

11) Who is responsible for safety at the work site after a permit has been extended?
            a. The original issuer and receiver.
            b. The person who countersigned the permit.
            c. The one who originally did the joint site inspection
            d. The issuer and receiver who signed the extension.

12) What happens if work must continue past the time the original permit was to expire?
            a. Extend the permit or issue a new one.
            b. Work can continue until the job is completed.
            c. Stop work and came back next day.
            d. Keep working but tell the issuer.

13) What are the basic precautions for confined space entry, select all items that apply.
            a. A sign a standby man, install lighting, install air mover.
            b. Take gas test.
            c. Isolate, clean and purge equipment.
            d. Use PPE.

14) A release of hazardous liquids or gases permit is required when?
            a. Operators release hydrocarbons to the flare.
            b. Crafts man builds a scaffold.
            c. Pipefitters open a line or install blinds.
            d. Operation drain equipment.

15) What hazard would you find when doing hot work?
            a. Auto ignition temperature.
            b. Ignition source.
            c. Ignition switch.
            d. Ignition point.

16) We use work permit in hazardous areas to identify …………
            a. Expired permit.
            b. Alternated representative.
            c. The designated representative.
            d. Hazards and precautions.

17) The use of a vehicle in an operating area requires, which work permit?
            a. Entry
            b. Hot  
            c. Cold
            d. Release

18) What are the basic precautions for cold work? Select all items that apply?
            a. Gas test.
            b. PPE, barricade and warning signs.
            c. Special work precautions.
            d. Standby man.
            e. Fire watch.

19) What is oxygen deficiency?
            a. A lower than normal amount of oxygen.  
            b. Higher than normal amount of oxygen.
            c. Less 23.5% oxygen.
            d. Oxygen that above it’s flash point.

20) What are the basic precautions for hot work permit? Select all items that apply?
            a. Blind, isolate, clean and purge equipment.
            b. Fire watch.
            c. Fire protection equipment
            d. Cover sewer drains.
            e. Gas test.

21) What is the acceptable level of LEL to allow hot work?
            a. 10 to 100 PPM.
            b. 0.0 PPM.  
            c. 5% to 50%
            d. 21% to 23.5%

22) Select the statement where all THREE items are needed before allowing entry into a confine space?
            a. Air mover, respirators and countersignatures.
            b. Fire watch, air mover, gas test.
            c. Gas test. Fire extinguisher, barricades.
            d. Lighting, standby man, air mover.  

23) The receiver can leave the job site any time as long as he gets the permeation from his supervisor. 
            a. True
            b. False  

24) Who should keep the work permit?
            a. The standby man.
            b. The receiver and issuer.
            c. Fire watch.
            d. Craft man.

25) What should be a assigned when working near combustible materials? 
            a. Standby man
            b. Fire watch  
            c. Fire man
            d. Flag man

26) What training should a fire watch have?
            a. Operate heavy equipment. 
            b. Operate control room.
            c. Operate fire equipment.  
            d. Operate radio equipment.

27) Who should ask for work permit before they start working?
            a. The standby man.
            b. The receiver.
            c. The fire watch.
            d. The issuer.

28) Who should point out all hazards and write on the work permit? 
            a. The issuer.
            b. The standby man.
            c. The fire watch
            d. The receiver.

29) Who is responsible for the safety on the work site?
            a. The receiver.
            b. The issuer.
            c. Both issuer and receiver.
            d. Both fire watch and the standby man.

30) What is the purpose of the joint site inspection?
            a. To check the availability of equipment and man power.
            b. To see the work plan and it is implementation.
            c. To discuss the work and identify any hazards and risk.
            d. To meet the works and observe their activities.

31) What must be checked during the joint site inspection? Select all items that apply.
            a. Safety devices.
            b. Equipment condition.
            c. Gas test.
            d. Attendance report.

32) Who decides whether an area should be restricted or not?
            a. The department manager.  
            b. The superintendent.
            c. The issuer.
            d. The receiver.

33) What type of work does the work permit system authorize?
            a. Specific construction, maintenance or repair work.
            b. All work constructed for Saudi Aramco.
            c. All work done by maintenance or contractors.
            d. Non-hazardous work where safety is important.

34) Who is a work permit receiver?
            a. A qualified Saudi Aramco employee.
            b. A person certified to receive permit.
            c. A person nominated by his supervisor.
            d. A maintenance or contract worker.

35) The safety of work site is a sole responsibility of an issuer?
            a. True.
            b. False.

36) What responsibility do issuers and receivers share when signing a work permit?
            a. Responding to emergency events.
            b. Monitoring the operation of process.
            c. Maintaining safety conditions at the site.
            d. Getting countersignatures form superintendent.

37) Restricted areas include which locations?
           
a. Gas plant, tank farms, and assembly areas.
            b. Pump station, tank farms, and gas well.  
            c. Dining halls housing unites, and operating area.
            d. Welding shops pump station, and assembly area.

38) Who can decided that work is a low risk and that a work permit is not needed?
            a. The superintendent.  
            b. The receiver.
            c. The department manager.
            d. The issuer.

39) Who must sign the work permit to close it?
            a. Competent person.
            b. Issuer and receiver.  
            c. Gas tester, issuer and receiver.
            d. Designated representative.

40) What must the receiver do if he stops work?
           
a. Tell the senior crafts man.
            b. Tell the designated representative.
            c. Tell the issuer.  
            d. Tell his immediate supervisor.

41) Work permit can be issued for up to 30 days if ……….
            a. The work site is far away.
            b. Only cold work will be done.
            c. It is highly unlikely that conditions will change.  
            d. The receiver cannot close the permit.

42) Who must sign a work permit to extend it?
            a. Superintendent’s countersignature is required.
            b. The new issuer, receiver and gas tester.
            c. The new issuer and receiver.  
            d. The new area foreman and the new issuer.

43) “use a fire blanket” or “hand dig only” are example of what?
            a. Hazards.
            b. Precautionary hazards.
            c. Regular precaution.
            d. Additional precautions.  

44) Work permit authorize …………
            a. Specific work at specific location.  
            b. Specific tools at general location.
            c. General work at specific plant.
            d. General equipment at all work site.

45) Where could an issuer find out which permit to issue for a special job?
            a. Facility operating instruments.
            b. On the front of any work permit.
            c. On the back of any work permit.  
            d. Corporate loss prevention manual.

46) The information’s entered in the “extra work location” box is important because it controls?
            a. What equipment the receiver can use.
            b. Where the receiver can work.  
            c. How long the receiver can work.
            d. How many worker can be at the job site?

47) What considered cold work?
            a. Sand removal and scaffold building.  
            b. Brush painting and abrasive blasting.
            c. Scaffold building and grinding.
            d. Abrasive blasting and painting.

48) What must the issuer do if a join site inspection is not done?
            a. Required barricades and warning sign.
            b. A sign a designated representative.
            c. Tell his foreman.
            d. Write why not on the permit.  

49) What must the issuer write in the work permit?
           
a. Name, badge number and certificate expiry date.
            b. Gas test results, name and badge number.
            c. Name, organization code and badge number.  
            d. Badge number and certificate number.

50) What information must the gas tester enter on the work permit?
            a. LTX-310 expiry date, name and badge number.
            b. Badge and certification number.
            c. Gas test results and normal level.
            d. Gas test results, name and badge number.  

51) Any worker can be a sign as standby man?
            a. True 
            b. False.  

52) Why must equipment be de-energized and depressurized before work is started?
            a. Accidental start-up could happen.  
            b. Purge gas can be lost.
            c. Locks and tags will deteriorate.

53) Who install locks and tags first?
            a. contractor.
            b. Power distribution.
            c. Electrical engineer.
            d. Operation.  

54) Installing lock and tags on electrical breakers prevents accidental.
            a. Blind installation.
            b. Start-up of equipment  
            c. Nitrogen release.
            d. Purging of equipment.

55) The issuer must try to start-up equipment at the field switch after it has been isolated and before work start to make sure.
            a. Locks and tags are installed.
            b. The receiver’s tag is installed.
            c. There is no tag in the area.
            d. It cannot accidently start.  

56) How can process equipment be cleaned?
            a. Treating and hydro cracking.
            b. Closing valves and adding locks
            c. Gas testing and steaming
            d. Steaming and or water- washing.  

57) Who installs receiver’s locks?
            a. One member from each work crew.  
            b. The engineer and receiver.
            c. The issuer and receiver.
            d. Every member of the work crew.

58) When operators change shifts.
            a. Their keys are usually transferred to the next shift.  
            b. Their tags must be erased.
            c. Their locks and tags must be removed.
            d. Their locks must be replaced.

59) We isolate equipment to make sure it cannot be.
            a. Shut-down on purpose.
            b. Shut-down by accident.
            c. Taken to a shop for repair.
            d. Started-up, leak or cause electrical shock.  

60) Why are hold tag installed?
            a. To record gas tests.
            b. To record accidents.
            c. Explain why the lock is installed?  
            d. To identify the issuer and receiver.


61) Removing fuses form an electrical circuit or disconnecting electric wiring is an example of what?
            a. Locking
            b. Cleaning.
            c. Purging.
            d. Isolating.